MES & ERP Integrations

BI-DIRECTIONAL ERP INTEGRATION,
DELIVERED AS A MAINTAINED CONNECTOR.

Custom integration projects run three to six months and never stop needing maintenance. Use maintained, bidirectional connectors instead — work orders and routings down to the floor, verified production and labor back to the system of record, in minutes rather than overnight batches.
erp-hero

WORK ORDERS DOWN.
VERIFIED PRODUCTION BACK.

Continuous exchange in both directions, with your ERP remaining the system of record and nothing writing to it silently.

STOP BUILDING
WHAT'S ALREADY BUILT.

A custom ERP integration runs three to six months and needs maintaining every time your ERP updates. Use connectors built and maintained for the systems discrete manufacturers actually run, deployed in weeks and kept current across versions — so the integration doesn't quietly decay after go-live.

Supported today, maintained tomorrow

Connectors are versioned against ERP releases and updated as those releases land, which is the part a one-off build never gets. Anything not on the list has a documented path rather than a research project.
wrench
MAINTAINED
Updated as your ERP versions change, so nobody on your team inherits the upkeep.
badge-check
PROVEN
Deployed across hundreds of plants, which means the edge cases were found on somebody else's timeline.
calendar-clock
WEEKS, NOT QUARTERS
Scoped, mapped, piloted, and live inside a normal project window.

THE PLAN GOES DOWN.
THE TRUTH COMES BACK.

Work orders, operations, routings, part specifications, and BOM data flow from the ERP into the operator's view. Production counts, labor, and quality flow back — attributed, validated at entry, and posted under the name of the operator who ran the job. Your ERP stays the system of record. Nothing writes to it silently.

One work order, both directions

The same order that dispatched from your ERP comes back with actual run time, good and reject counts, reasons, and completion status. No re-keying, no reconciliation, no second version of the shift.
hard-hat (3)
DOWN TO THE FLOOR
Orders, routings, standards, due dates, and part detail in front of the operator running the job.
list-start
BACK TO THE RECORD
Counts, labor, scrap reasons, and job status returned to the ERP automatically.
tag
ATTRIBUTED
Every transaction under the operator's name, with a full audit trail behind it.

SAY GOODBYE
TO THE NIGHTLY BATCH.

Batch processing means your ERP is always describing a shift that already ended. Completions reach ERP inventory in near real time, a work order changed in the ERP appears on operator dashboards on the next sync, and labor tickets generate from actual machine run time as the work happens.

Current enough to act on

Planners stop working from a picture that's hours old, and the priority change made in the office reaches the station without anyone walking the floor to deliver it.
refresh-ccw (3)
CONTINUOUS
Exchanges run on a short cadence rather than an overnight job.
list-ordered (1)
INVENTORY ACCURACY
Completions post as they happen, so what the ERP thinks you have is what you have.
hard-hat (3)
LABOR AS IT HAPPENS
Tickets built from real run time instead of reconstructed at end of shift.

CONFIGURED TO
YOUR ERP.
NOT TO OURS.

No two ERP instances are configured the same way, and a connector that assumes otherwise breaks in month two. Match resources, personnel, reason codes, and data fields to how your system is actually set up — with role-based permissions and a full audit trail, so the people who understand the floor can maintain the mapping while IT sees every change.

Maintained by the people who understand it

A reason code change or a new machine resource shouldn't require a support ticket or a developer. Planners and engineers make the change; IT keeps oversight and a record of who changed what.
circle-user-round (1)
SELF-SERVICE
Resource, personnel, and reason code alignment handled by your team, without a ticket.
shield-check
GOVERNED
Role-based permissions keep ERP configuration restricted to the administrators who should hold it.
list-ordered (1)
AUDITABLE
Every mapping change recorded, with who made it and when.

CONNECT ANYTHING.
EVEN THE HOMEGROWN SYSTEM.

Plenty of manufacturers run something a connector was never written for — a heavily modified instance, a system nobody supports anymore, or a spreadsheet that has quietly become the schedule. Every one of those has a path: a documented SDK and reference architecture, REST and GraphQL APIs, or file-based exchange where that's genuinely what exists.

A path for every environment

Pre-built where a connector exists. Custom connector services where it doesn't. Self-implementation with the API toolkit if your team would rather own it. And CSV or Excel exchange for the systems that will never have an API.
file-text
DOCUMENTED SDK
A published kit and reference architecture, so building a connector is a defined project rather than a discovery exercise.
code-xml
MODERN APIS
REST for broad compatibility and GraphQL for precise, query-shaped access with real-time subscriptions.
folder-sync-1
FILE-BASED
Excel and CSV exchange for the production data that lives outside any system at all.
See It In Action

Your ERP stays the system of record for orders, inventory, costing, and financials. What changes is the quality of what reaches it: verified, attributed, and timely instead of reconstructed. And every ERP has a nuance that isn't standard — we identify yours during scoping rather than letting you find it in month three. NOTHING WRITES SILENTLY.

TESTIMONIALS

THE ERP FINALLY MATCHED THE FLOOR.

Manufacturers running verified production and labor into the system of record, without a custom integration project or a data entry campaign.
Explore Case Studies

THE INTEGRATION DECIDED THE VENDOR.

"We knew before going into this that our ERP integration was going to be super important. We didn't really understand all of the details about how it was going to work, whether it was going to be unidirectional, bidirectional, and how that data was going to flow back and forth. But we did understand that we wanted the real-time machine data connected to the Epicor data."

- Jared Talladay, Operations Manager

Learn More

THEY EXPECTED A MESS.

"I was going to check every single labor ticket, every single entry, because I'm expecting a mess. And I was pleasantly surprised how easily we were able to integrate within a matter of weeks."

- Efren Escobar, Director of Operations

Learn More

THE DATA IN JOBBOSS WAS WRONG.

JobBoss held a significant amount of incorrect data because machinists running two or three machines were reconstructing labor after the fact. Machine-verified capture replaced it.

Learn More

EXPLORE MORE CONTENT

WEBINAR

Better Data, Better Decisions

Your night shift operator says a part should take 10 minutes to run. Your ERP says 5. Who do you believe? Hear how one shop unlocked faster decisions, better reporting accuracy, and a more connected operation.

Learn more

Case Study

How Harvey Performance Closed the Execution Gap with Intelligent MES

Learn how Harvey Performance used MachineMetrics Intelligent MES to align ERP plans with shop-floor execution, improving schedule attainment and operational efficiency.

Learn more

Webinar

From Disconnected to Data-Driven Webinar | March 26

Discover how ABACORP integrated MachineMetrics with their ERP to enhance manufacturing execution, improves decision-making, and optimizes production efficiency. Tune in March 26.

Learn more

WEBINAR

Bridging the Gap: Solving the ERP Disconnect for Infor ERP

Discover how to overcome ERP challenges with real-time MES intelligence, enabling seamless integration and enhanced shop floor operations for efficient digital transformation.

Learn more