Production Scheduling Software

THE PLAN NEVER GOES TO PLAN.
DO SOMETHING ABOUT IT
BEFORE IT COSTS YOU.

Sync work orders from your ERP, sequence them against the capacity your machines actually have, and make dynamic adjustments in real time — so your entire team can reduce WIP, prioritize the right jobs, and deliver on time, every time.
Image (Replace) (1)

BUILD THE SCHEDULE ONCE.
LET THE FLOOR KEEP IT HONEST.

Everything below lives in the Execute layer of MaximaOS, running on the same live data model as machine monitoring, downtime, and analytics. One schedule, one source of truth, no reconciliation step.

SYNC BOTH WAYS WITH THE ERP YOU ALREADY RUN

It starts with your system of record. Pre-built connectors for Epicor Kinetic, Infor Visual, Infor XA, Infor Syteline, and JobBOSS² pull work orders, routings, and machine assignments — and write completions, labor, and scrap back. Running something custom or SQL-based? The SDK handles it. Your ERP stays the system of record; MaximaOS makes it accurate.
ERP sync

PLAN AGAINST REAL CAPACITY, NOT THEORETICAL CAPACITY

Before you sequence anything, see what the floor can actually absorb. The capacity timeline is built from observed cycle times, actual changeover durations, and real availability per asset. Scroll forward to find next week’s overload. Spot the standards that have drifted far enough to be worth fixing at the source — before they poison the next quote.
flagged capacity

DRAG, DROP, DONE

Move a job to another machine, resequence a queue, or bump a hot order to the front of the line — from a visual board built for how planners actually work. Every change publishes immediately to the floor. No republish step, no overnight batch, no email asking the supervisor to tell second shift.
drag drop

AUTO-SEQUENCE WHEN YOU WANT TO. OVERRIDE WHENEVER YOU NEED TO.

Turn on auto-scheduling and let the platform sequence by due date across available capacity. Turn it off and drive it manually. Most teams start manual and add automation one machine group at a time — the schedule adapts to your process, not the reverse.
Content Wrapper

CONTROL WHO CAN MOVE WHAT

Role-based permissions decide who publishes changes. Give supervisors authority to reflow their own area in real time, keep the master sequence with planning, and know who changed what either way.
user permission

PUSH THE NEXT JOB TO THE OPERATOR’S SCREEN

ShopPulse shows each operator their prioritized queue on a tablet at the machine: current job, next job, estimated start, parts against target, setup steps, tool life on active tools. Late orders flag in color. Operators running four machines get one ranked list instead of four dashboards — and nobody walks to the office to find out what’s next.
Next Scheduled Job

START THE JOB WITHOUT TYPING ANYTHING

Automated production monitoring matches machine signals to the ERP work order and detects the setup-to-production transition on its own. See when the spindle started; the operator confirms with one tap. On palletized cells running twenty jobs unattended, the control tells the platform what’s running. Labor tickets, part counts, and scrap flow back to the ERP without double entry.
apm

SEE THE FINISH TIME UPDATE WITH EVERY CYCLE

Real-time ETTC recalculates as parts come off the machine. A job running 12% under standard shows a new completion time within the cycle — and every downstream operation on that machine shifts with it. The schedule corrects itself instead of waiting for someone to close a work order.
time updating

CATCH THE LATE JOB BEFORE IT’S LATE

Set the risk threshold and let the schedule watch itself. Work orders trending past their due date surface automatically, with enough runway to move them to open capacity instead of expediting after the customer calls. Supervisors see the exceptions, not the whole board.
CATCH THE LATE JOB

PUT THE WHOLE FLOOR ON ONE SCREEN

The Production Order Dashboard renders every machine as a color-coded card: state, current work order and operation, run duration, parts against target, and next job queued. Full-screen it on a shop floor TV or filter to one machine group for a morning standup. Walk in and know where the day stands in five seconds.
Production Order Dashboard for Job Tracking 2

MEASURE THE SCHEDULE, NOT JUST THE OUTPUT

The Schedule Attainment dashboard puts scheduled start and end times beside actual, work order by work order. Toggle day-level or hour-level. Track on-time starts and on-time completions as separate numbers, because a job that starts late and finishes on time still cost you something. Filter by date range, search by work order, and give the plant a benchmarkable KPI instead of an argument.
Schedule Attainment Dash
See It In Action

Scheduling is one stage of a loop that runs all day: sense what changed, decide, dispatch, verify, recover. Most software owns one stage and leaves you the rest. KNOW WHAT CHANGED. DECIDE WHAT RUNS NEXT.

TESTIMONIALS

PROOF, NOT PROJECTIONS

Discrete manufacturers running MaximaOS to keep the plan and the floor on the same page.
Explore Case Studies

MORE THAN 25% IMPROVEMENT IN SCHEDULE ATTAINMENT

Harvey Performance rebuilt scheduling around live machine data instead of standard times.
“With the ROI of a three-month pilot at one facility, we were able to pay for the deployment of MachineMetrics across the entire company.” — Matt Townsend, Director of Operational Excellence, Paragon Medical

"We can now predict potential delays and address them before they happen, which helps us maintain customer satisfaction and avoid giving customers any reason to go to a competitor."

 

EXPLORE MORE CONTENT

SESSION

Tribal Knowledge to AI-Guided Execution: What We're Building

Your factory's smartest decisions live in your senior operators' heads. Here's how AI-guided execution turns tribal knowledge into real action on the shop floor

Learn more

WEBINAR

How Harvey Performance Closed the Execution Gap with Intelligent MES

Learn how Harvey Performance used MachineMetrics Intelligent MES to align ERP plans with shop-floor execution, improving schedule attainment and operational efficiency.

Learn more

SESSION

We Went to ProveIt! to Challenge a Popular Belief. Here's What Happened.

MachineMetrics CEO Bill Bither went to ProveIt! 2026 to challenge the idea that manufacturers have to build their MES from scratch. Here's what he proved.

Learn more

CASE STUDY

How Tuffaloy Closed the Execution Gap on Epicor

Better Data, Better Decisions: How Tuffaloy Closed the Execution Gap on Epicor

Learn more